Dan can tile a floor in 3 hours. his assistant could tile the same floor in 8 hours. if they work together, how long will it take to tile the floor?

Respuesta :

wolf1728
wolf1728 wolf1728
  • 18-08-2018

There is a formula for this:

Total Time = (worker1 * worker2) / (worker1 + worker2)

(3 * 8) / (3 + 8)

24 / 11 =

2.1818181818 hours


Answer Link

Otras preguntas

What is the effect of the house representatives voted to renew the Tarrif South Carolina threatened to nullify the terrif and possibly secede
The experiment calls for preparing one of two salts, either copper(ii) sulfate or potassium aluminum sulfate. The instructions for the potassium aluminum sulfat
which type of irony is in the gift of the magi
Which figure of speech is used in this text? Society often forgives the criminal; it never forgives the dreamer. -Oscar Wilde, The Critic as Artist apostrophe a
A wheel with a radius of 30 cm and a weight of 5 kg stands in front of a step with a height of 12 cm. What is the smallest horizontal force that needs to be app
What is the difference between studying high school in the United States and Mexico?
A shipping company is buying new trucks. The high-capacity trucks cost $50,000 and hold 320 cases of merchandise. The low-capacity trucks cost $30,000 and hold
What is the average rate of change? x= 1, 2, 7 y= 4, 5, 10 A: 4 B: 2/5 C: 1 D: 2 E: 1/4
Central and inscribed angles question 18
Which is the simplified form of the expression (6^-2*6⁵)⁻³?A. 6³⁰B.1/6⁹C.6⁰D.1/6¹³