quaidooephraim1
quaidooephraim1 quaidooephraim1
  • 18-07-2021
  • Mathematics
contestada

5 people cleared a plot of land in 15 days.How many people would i need to hire to clear three times that plot in 5 days​

Respuesta :

day1005
day1005 day1005
  • 18-07-2021

Answer:

45 people

Step-by-step explanation:

Answer Link
eilliyahrameen
eilliyahrameen eilliyahrameen
  • 18-07-2021

Answer:

45

Step-by-step explanation:

ln 15 days 5ppl work

ln 15 days if three times of that ppl work=5×3

=15ppl

So in 1 day=15×15\5 ppl

=45ppl

lt takes 45ppl to clear three times the plot in 5 days.

Answer Link

Otras preguntas

O esqueleto humano é extremamente rígido, mas sua flexibilidade e mobilidade são garantidas pelas articulações. Imagine como seria a movimentação do nosso corpo
What is the acceleration of the block?
If the regression line predicts 8.67 wins and the slope is .35 what is the intercept of the line?
What expressions are equivalent to 10a-25+5b
What is the inverse of the given relation? y=2x−1
Which of the following screening instruments is the most widely used and validated for youth and screens for alcohol and other substance use? Would it be audit,
Discrete math Prove that the product of any integer and any rational number is a rational number. We are working on things like closure property
Label each sentence from the paragraph using the descriptions provided. In 2016, texting and driving was the cause of more than 50,000 car crashes (Roustan). Se
Which number is not a solution of 2x-5 greater than or equal too 3
What is the pattern of the dots, I accidentally had my calculator on rad instead of dec pls help me